Folkestone, UK

Commissioned by the Folkestone Harbour & Seafront Development Company - the enterprise led by Sir Roger de Haan - Plot D-1 represents the third phase of the development that is seeking to regenerate this formerly derelict part of town.

Plot D-1 challenges the strict geometry of the masterplan’s crescents by opening gaps in the perimeter volume allowing sea views from every building and creating a relationship to the listed terrace opposite Marine Parade. The design is based around extensive terraces and balconies and a sheltered central communal garden with direct access to the beach.

The modular façade was conceived as a series of pre-fabricated load-bearing elements that reduce embodied carbon and withstand the harsh marine environment while the geometry optimizes self-shading of the exposed facades. The external terracotta finish reflects the varying light conditions giving the buildings an ever-changing appearance while the internal colour scheme is taken from the tones of the shingle beach.

Design Team:

Design Architect: A IS FOR ARCHITECTURE, London, UK
Landscape Design: Spacehub, London, UK
Structural Engineering: Eckersley O'Callaghan, London, UK
MEP Engineering: Cudd Bentley, London, UK
Facade Consulting: Eckersley O'Callaghan, London, UK
Facade Access: Eckersley O'Callaghan, London, UK
Fire Engineering: Atelier Ten, London, UK
Sustainability: Atelier Ten, London, UK
Transport: Pell Frischmann, London, UK
Project Management: Spider Projects, Kent, UK
Cost Consulting: Spider Projects, Kent, UK
Planning Consulting: Savills, London, UK
Heritage Consulting: S L Heritage Architecture, London, UK
Inclusive Design: David Bonnett Associates, London, UK

Client:
Folkestone Harbour & Seafront Company
Date: 
2021-
Status:
Planning Approved
Size:
15,000 m2
Architecture:
A IS FOR ARCHITECTURE
Location:
Folkestone, UK
No items found.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.